How We Import
From factory floor in China, Turkey, or Europe to your farm in Pakistan — a transparent, six-step process built around quality and reliability.
No Middlemen. No Surprises.
Most agricultural machinery in Pakistan passes through three or four layers of agents before it reaches a farmer — each adding cost and reducing accountability. Reliateca Enterprises works directly with certified manufacturers, manages every step of the import chain, and delivers to your door with full documentation. Here is exactly how we do it.
Supplier Sourcing & Vetting
We identify and audit manufacturers at source before placing any order.
Our team attends major agricultural trade fairs in China, Turkey, and Europe every year — including CIAME Beijing, Agritechnica Hannover, and SIMA Paris. Every potential supplier is evaluated against a strict checklist: ISO or CE certification, production capacity, export track record, and on-site factory audit. We only work with manufacturers who pass all criteria.
- ISO 9001 or CE certification verified
- On-site factory audit completed
- Minimum 3-year export history required
- Sample unit tested before bulk order
Pre-Shipment Inspection
Every unit is checked before the container is sealed.
Before any shipment leaves the factory, our team or an accredited third-party inspection agency (SGS or Bureau Veritas) verifies each unit against our quality checklist. We check engine specifications, hydraulic systems, electrical wiring, paint finish, and dimensional tolerances. Any unit that fails inspection is replaced or repaired before shipment — at the manufacturer's cost.
- Engine output and fuel system tested
- Hydraulic lift and PTO shaft verified
- Electrical systems and safety guards checked
- SGS / Bureau Veritas certificate issued
Shipping & Customs Clearance
We handle all documentation, duties, and port clearance.
Once inspection is passed, we arrange sea freight from the origin port to Karachi or Port Qasim. Our in-house customs team prepares and files all import documentation — Bill of Lading, Certificate of Origin, Packing List, Commercial Invoice, and SRO duty exemption applications where applicable. We clear goods within 5–10 working days of vessel arrival.
- Bill of Lading and COO prepared
- SRO duty exemption filed where applicable
- Customs cleared at Karachi or Port Qasim
- Full document set handed to customer
Inland Transport & Delivery
From port to our warehouse, then onward to your location.
After customs clearance, machinery is transported to our Islamabad or Lahore warehouse via our trusted logistics partners. From there, we arrange onward delivery to the customer's farm or business address anywhere in Pakistan. We use flatbed trailers and low-loaders for heavy equipment, and enclosed trucks for smaller machinery and tools.
- Port-to-warehouse transport arranged
- Nationwide delivery to customer address
- Flatbed / low-loader for heavy equipment
- Delivery timeline confirmed in advance
On-Site Commissioning & Training
Our technicians set up the equipment and train your operators.
Delivery is not the end of our job. Our field technicians commission every machine on-site — checking fluid levels, calibrating settings, and running a full operational test. They then walk the customer's operators through safe use, daily maintenance checks, and common troubleshooting. A printed maintenance schedule and spare parts list is provided with every unit.
- On-site commissioning by Reliateca technician
- Operator training completed
- Maintenance schedule provided in Urdu and English
- Spare parts list and reorder contacts given
After-Sales Support
Spare parts, technical help, and warranty management — long after delivery.
We stock a comprehensive range of spare parts for every product we sell at both our Islamabad and Lahore warehouses. Customers can call or WhatsApp our technical helpline for troubleshooting advice. Warranty claims are handled directly with the manufacturer — we act as your advocate, not just a sales channel. Most parts are dispatched within 24 hours of order.
- Spare parts stocked at both offices
- Technical helpline available Mon–Sat
- Warranty claims managed on your behalf
- Parts dispatched within 24 hours
Typical Timeline: 60–90 Days Farm-to-Farm
From order confirmation to on-site commissioning
Supplier Sourcing & Vetting
Pre-Shipment Inspection
Shipping & Customs Clearance
Inland Transport & Delivery
On-Site Commissioning & Training
After-Sales Support
Common Questions
Ready to place an order or get a quote?
Our team is available Monday to Saturday, 9 AM to 6 PM at both offices. Send us a product inquiry and we will respond within one working day.